Hello everyone
I am working out the apropiate size of the end transverse beam in a coach/bus which has a 3 to6 Ton trail tied to a hook in that beam. Does anybody know the appropiate horizontal/vertical force magnitude that I should take into account for my calculations? I consider braking (1 g) as the maximum effort. Is that right or do I miss some other extreme situation?
Thank you everybody
PedroRB
I am working out the apropiate size of the end transverse beam in a coach/bus which has a 3 to6 Ton trail tied to a hook in that beam. Does anybody know the appropiate horizontal/vertical force magnitude that I should take into account for my calculations? I consider braking (1 g) as the maximum effort. Is that right or do I miss some other extreme situation?
Thank you everybody