ASCE MOP No. 36 (WPCF MOP #8) 1977, "Wastewater Treatment Plant Design" contained the guidance, "On all low spots where gritty material is likely to accumulate and restrict flow through the pipe, a blow-off should be installed if practical."
I am not aware of this being mentioned in some later versions of various publications of ASCE, and also different organizations that also mention force mains (while the good intent is obvious, I guess "practical" could conceivably have a different meaning in different locations, or in a some different regulatory etc. environments than in 1977).