Thanks. I am new on the scene and don't have boiler experience. Our existing boiler is new, running off and on for 3-4 months. We've had problems with the tubes leaking at the steam drum, vendor re-seated and hydro tested, still leaks badly. They are going to weld all tubes starting next week. In researching the problem, I've been told that the ASME code specified welded tubes over 150psi, our spec was 200psi. I'm looking for confirmation that is was true. I'll see about getting a copy of PFT.