Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

For probabilistic analysis is there a way to assign a return period for a Probable Maximum Flood

Status
Not open for further replies.

Atros

Geotechnical
Jun 26, 2015
13
Hi,

I need to define a return period for the probable maximum flood (PMF). From the hidrology i have the return period vs volume from 5 to 10.000 years. I also have the PMF volume. What would you recommend? Fitting a curve with log or other type? Is there any literature that talks discusses PMF probables return period? (20.000 or 200.000 years).

Thanks
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor