I am in need of some advice.
I had a company move an existing steel beam flush with the joists to add head room in a basement. They "packed" the web of the beam with 2X material and hung the joists from that with joist hangers. They used powder actuated nails and glue to attach the 2X material to the web of the beam, is this acceptable or should they have bolted the wood to the beam? also they did not use top mount hangers they are regular hangers attached only to the packing in the beam
Thanks in advance
I had a company move an existing steel beam flush with the joists to add head room in a basement. They "packed" the web of the beam with 2X material and hung the joists from that with joist hangers. They used powder actuated nails and glue to attach the 2X material to the web of the beam, is this acceptable or should they have bolted the wood to the beam? also they did not use top mount hangers they are regular hangers attached only to the packing in the beam