jheidt2543
Civil/Environmental
- Sep 23, 2001
- 1,469
I have run across a couple of projects that have "flowable fill" required as a backfill material. Basically the spec. calls out "low strength concrete of 1,000 psi at 28 days" or something similar. Are there any standard mix designs or specifications available?