khardy
Mechanical
- Jul 7, 2004
- 74
Welding a 4" WOL on a std wt 10" live fuel line. The fuel is gasoline. This line runs from a tank farm some miles away to a port. We are sure the line is completely purged of all air. It would be very difficult to have any flow during the operation.
Must there be a minimum flow to weld the WOL on? API-2201 is a little vague. Elsewhere I have read that you can do this with no flow on a case by case basis.
My thoughts are to weld one pass at a time. The far end of the mainline at the tank farm is open to the tank which is vented - so over pressure due to thermal expansion is not an issue.
Must there be a minimum flow to weld the WOL on? API-2201 is a little vague. Elsewhere I have read that you can do this with no flow on a case by case basis.
My thoughts are to weld one pass at a time. The far end of the mainline at the tank farm is open to the tank which is vented - so over pressure due to thermal expansion is not an issue.