We have high clay soils in this area of Central Texas and this is a high volume of traffic street (arterial). The contract was awarded with the contractor having Option A- 2.5" HMAC over 8" crushed limestone compacted base course over 6" lime stabilized subgrade or Option B 2.5" HMAC over 12" crushed limestone compacted base course over MC 30 prime coat or an emulsion applied to raw subgrade.
The contractor is going with Option B. We are having doubts about Option B.
Has anybody had experience with the Option B pavement section? For this area, lime stabilized subgrade is the standard, so for me, I am out of my comfort zone with Option B.
Thanks