designmr
Mechanical
- Nov 29, 2005
- 230
(REF:thread1103-140248 )
On the above ref thread, at work we have a large aluminum angle frame (many internal "L" angles also) being welded up (approx 80 H, 86 W, 42" D. Being that it is welded and many components get fitted within it, size matters. Our welding department doesn't have all the clamps and setup to hold it dead on.
So, the people in charge are saying let change the overall dimensions to 3 place dims, and give a flatness of .187, also perpendicularity of .187.
Now to me that sounds pretty HARD to keep, am I right to think this is going to be to hard to keep? Also, if this job gets sub-contracted out, it will COST alot more $$$.
On the above ref thread, at work we have a large aluminum angle frame (many internal "L" angles also) being welded up (approx 80 H, 86 W, 42" D. Being that it is welded and many components get fitted within it, size matters. Our welding department doesn't have all the clamps and setup to hold it dead on.
So, the people in charge are saying let change the overall dimensions to 3 place dims, and give a flatness of .187, also perpendicularity of .187.
Now to me that sounds pretty HARD to keep, am I right to think this is going to be to hard to keep? Also, if this job gets sub-contracted out, it will COST alot more $$$.