Dear Friends,
I'm seeing the "walls of castle" of the Engineering Departements growing up more and more

McLoad, you have lifted the "bridge" "for a moment": and this is not a good new for me.
Please, take into account the following facts.
The use of CIM and TQM (to increase the competiveness of the company when there are extendend suppliers-customers chains and nets, as on the automotive and serial production), requests one special attention to all characteristics, for variables and for attributes.
Somebody-somewhere in the company needs to stabilize the flow. This stabilization has an added value for the final customer (increasing the flow does the product more competitive).
Somebody-somewhere decided, that for stailizing the flow, it is necessary to reduce the variability of the output of all process having an impact on the production/company flow.
Somebody-somewhere decided to measure these variability, in order to do specific actions to reduce the variability and incresing the production/company flow. How to measure this variability? Measuring, inspecting all those characteristics that, in the past, or that could be "blocking" the flow of CIM's processes (all the processes! Have you intented what I mean).
In the past, the controlling methods used were not effective. The statistical sampling was sometimes ineffective with CIM and TQM.
Sometime somebody underextimated the importance of one characteristic, sometime somebody forgot an other characteristic. After those facts, somebody-somewhere decided to putting under control all the operations/processes, that have or could be a critical impact on the flow of the CIM processes, using the simplest methods known: check all the characteristics linked to the CIM processes (production, informative, logistic, managerial processes!).
How? Somebody-somewhere decided to perform an in-line and off-line measuring controls during the time. For these tasks somebody-somewhere decided first to numbering all the characteristics sequentially and, second, to use these numbers to taking under control the variability of the specific characteristic (--> database).
So, somebody-somewhere does, by hand, the circling and numbering sequentially the characteristics. How is the costs of this ancillary activities? Every guy, working in the engineering/time study departements, can gives the answer. That guy, may be or not, knows what his boss knows: the value lost caused by variability on the production flow.
Let's imagine now that your boss in charges you of finding where allocate this activity and to propose the best way to performe it. He requests you not only an opinion but an evaluation of economics, times, resourses, for different solutions.
This is - Hush, Curmudgeon, MadMango, ivymike - the original question posed by McLeod, but under the perspective of the Production Flow. This, as you see, is not an ancillary matter.
The ball is yours ....
Gianfranco.
N.B.^3: Friends, it seems a game but, who has worked in the automotive field in Japan, Europe and in some company in US, knows, more or less, the answer, and knows that the questions is very serious for the boss. Why?
Please, first replay!.