Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations Ron247 on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

FIU Bridge Update - New Bridge Has Broken Ground

epoxybot

Structural
Jul 31, 2006
604
The replacement for the failed FIU Pedestrian Bridge has broken ground. While not visible on Google Maps, there is satellite imagery on Google Earth from 3/2025. So far it appears to be all ground work, on FIU campus and both sides of the canal (Sweetwater). The original bridge had a $16 million price tag, while the new steel-beamed bridge is more than double. It comes with not just one but TWO (2) faux stay-cable towers. Double your pleasure - Double your price.




 
Replies continue below

Recommended for you

That will be a pedestrian bridge two people wide with supports every 40 or 50ft.

This is close to a road bridge with a significant span, plus two sets of lifts either end. They will be $2M each without any effort.

I was incorrectly assuming a mid-span pier placed in the median strip. I see that that won't work. So, a single 200' span instead of two 100'.

I'm not following your comment about "two sets of lifts at either end". What is that? And what does it have to do with the price of the bridge? "They" will be $2M...?

This site:


shows a price of $250,000 for a 100' highway span. I will speculate that a 200' span will experience a "cubed" cost--a cost increase of 9 fold. The cost then increases to $2.25 million. However, since this is for a highway bridge, I will cut the cost in half for a pedestrian bridge.

So I come up with a cost for the bridge of $1.3 million.