I have a new vessel with a range of relief cases. I'm proposing to install a single conventional PSV.
The governing case is gas blow by. For the fire case, the relief load is less than 25% PSV capacity so i believe chatter may be a risk for the fire case (as per guidance in API 521). However, this seems to be a common problem for fire relief.
Do i need to alter my PSV design just to avoid chatter in the fire relief case?
Thanks.
The governing case is gas blow by. For the fire case, the relief load is less than 25% PSV capacity so i believe chatter may be a risk for the fire case (as per guidance in API 521). However, this seems to be a common problem for fire relief.