SLTA
Structural
- Aug 11, 2008
- 1,641
Boy do I get the interesting ones...
See the pics. 20 year old house - for some reason the contractor either didn't install the last course of CMU at the lower level deck or cut it away. I'm fixing the deck, no troubles, but the remaining gap between the lower CMU and the higher slab on grade for the house floor is letting the gravel and soil between leak out. How do I get at that to fill the void, block the hole, or otherwise fix it, without taking off the lower level of the deck? And what do I use to fill the void?
Please remember: we're not all guys!
See the pics. 20 year old house - for some reason the contractor either didn't install the last course of CMU at the lower level deck or cut it away. I'm fixing the deck, no troubles, but the remaining gap between the lower CMU and the higher slab on grade for the house floor is letting the gravel and soil between leak out. How do I get at that to fill the void, block the hole, or otherwise fix it, without taking off the lower level of the deck? And what do I use to fill the void?



Please remember: we're not all guys!