mickcwa
Civil/Environmental
- Aug 20, 2004
- 6
I've had a developer approach me about extending a subdivision into a FEMA flood plain. Their thoughts and mine would be to raise the elevation of the ground to above the base flood elevation. We have done this is the past with relatively small sites. However, the thing that concerns me is the length of fill along the creek itself. The fill would basically raise the ground level for about 1000'.
I am also wondering about coordination/approval from FEMA and how to go about getting it. This is a studied creek that has base flood elevations associated with it. If anyone has dealt with this situation, I would greatly appreciate some help.
Thanks,
Mick