cap4000, that's our fault as an engineering profession for not charging the correct fees. In my opinion, part of the problem is architects. Our fees are tied to whatever they agree to accept from the client. At least in my part of the world. When I'm able to work directly for the owner, my fees are generally better than when working thru the architect.
just wondering, how many of you set your fee agreement as a % of construction costs instead of a fixed fee? I always do a fixed fee contract. When the architect asks me to do a % of construction cost agreement, I refuse. I sell the fixed fee two ways: 1) If I do a % of construction cost, I want the construction costs to be as high as possible so where is the incentive for me to be economical? 2) what part of the construction costs will govern my final fee and how do I verify those costs?