A.) Be absoulutely certain you have insurance and that you have enough, both O&E and generally liability. Most standard design firms do not have O&E covreage for this type of work. General liability should be substantial; 10 million would be a minimum, with 30 to 50 million more reaistic.
B.) Be sure to review, with design engineer present, with the contractor's project manager, superintendent and crane operator. Have a third party review it.
C.) Buy Shaperio's book "Cranes and Derricks" 3rd ed.
D.) Temporary construction is different from standard structural engineering.