yakpol
Structural
- Jun 1, 2001
- 450
I am assessing existing highway steel box-girder bridge for light rail loads. The fatigue loading is not well defined in the project design criteria. It references fatigue design to AASHTO which deals with highway loads. The main dilema is: how many trains shall be on two-track bridge? According to AREMA: two, if to follow AASHTO ideology: only one.
Greatly appreciate sharing experience on this subject!
Yakpol
Greatly appreciate sharing experience on this subject!
Yakpol