tw
Structural
- May 30, 2001
- 70
Is there any reason to pay attention to the (more restrictive) metal deck span limits from Factory Mutual for normal commercial construction? The CSI deck catalog I have gives them in their tables and they have a Factory Mutual approval guide at:
I've only had to work with Factory Mutual requirements one time at an industrial facility and this is the first time I noticed it in deck catalog.
tw
I've only had to work with Factory Mutual requirements one time at an industrial facility and this is the first time I noticed it in deck catalog.
tw