lago123
Chemical
- Dec 4, 2008
- 1
I am designing a cooling water system, it has an expansion tank that according to all the standards should go on the highest point on the system, but..there is not enough space so it will have to go on the lowest point of the system (all the users will be above the tank and pumps). In order to make it work i can put inert gas to pressurize the vessel, what other considerations should I have to take to lower the tank?
Thanks !
Thanks !