tonykim325
Structural
- Jul 13, 2009
- 1
I am using an existing concrete floor slab drawing. They used "EMM 3-9-35" to specify the mesh back then. Does anyone know what the numbers mean? Is there an area of steel that I can use for evaluation?
Thanks.
Tony
Thanks.
Tony