local19
Military
- Sep 13, 2006
- 5
Background:
location: Philadelphia
11 story building-condos
trash chute and recycle chute traverses all 11 floors
three exhaust systems on floors-toilet, dryer and kitchen to a common duct chase up to 3 roof fans.
Owner (and owner's engineer) wants to exhaust the trash / recycle chutes with the exhaust ducts (dryer, kitchen & toilet) on the floors. They propose tieing in to these exhaust systems.
My understanding of the IMC is: all must be individual exhaust systems with a make up air to the trash / recycle chutes.
I believe I'm reading it correctly. Comments, PLEASE !!
Thank You.
location: Philadelphia
11 story building-condos
trash chute and recycle chute traverses all 11 floors
three exhaust systems on floors-toilet, dryer and kitchen to a common duct chase up to 3 roof fans.
Owner (and owner's engineer) wants to exhaust the trash / recycle chutes with the exhaust ducts (dryer, kitchen & toilet) on the floors. They propose tieing in to these exhaust systems.
My understanding of the IMC is: all must be individual exhaust systems with a make up air to the trash / recycle chutes.
I believe I'm reading it correctly. Comments, PLEASE !!
Thank You.