Iradah
Chemical
- May 31, 2011
- 66
Hello all,
I am thinking of mixing a 1,600 bbls of liquid C4 stream with 40 mmscfd natural gas stream.
They will meet in 16" header and flow for ~ 50 meters before entering an amine plant.
the stream should be totally in the gas phase before it enters the amine plant as it will go to the contactor. there is an inlet scrubber, but we do not want to knock out C4 there.
Can someone advise on how I can know if 50 meters travelling in 16" ID line is enough to evaporate the whole C4 before it reaches Amine plant?
I am thinking of mixing a 1,600 bbls of liquid C4 stream with 40 mmscfd natural gas stream.
They will meet in 16" header and flow for ~ 50 meters before entering an amine plant.
the stream should be totally in the gas phase before it enters the amine plant as it will go to the contactor. there is an inlet scrubber, but we do not want to knock out C4 there.
Can someone advise on how I can know if 50 meters travelling in 16" ID line is enough to evaporate the whole C4 before it reaches Amine plant?