Hi,
Does anybody know how come the results for design of a concrete shear wall with two columns at the ends of the wall is different from area of rebars for the columns in "Concrete design/check of structure"? I designed a shear wall with columns and modeled the wall with wall section and columns and for designing shear wall I used "General method" with "pier Section". Design of column itself shows I need 6% area of reinforcement and design of shear wall with "pier section" that includes shear wall and columns needs 2% area of reinforcement in columns. Thanks for your help.
Matt
Does anybody know how come the results for design of a concrete shear wall with two columns at the ends of the wall is different from area of rebars for the columns in "Concrete design/check of structure"? I designed a shear wall with columns and modeled the wall with wall section and columns and for designing shear wall I used "General method" with "pier Section". Design of column itself shows I need 6% area of reinforcement and design of shear wall with "pier section" that includes shear wall and columns needs 2% area of reinforcement in columns. Thanks for your help.
Matt