Tunalover
Mechanical
- Mar 28, 2002
- 1,179
Folks:
I have a very simple die cast box with a 3.5deg drafts on four sides. The opening flange and the bottom are parallel. The problem is that, to machine any features into any side of this box requires three mutually perpendicular datum planes. The primary datum plane is obviously established
Tunalover
I have a very simple die cast box with a 3.5deg drafts on four sides. The opening flange and the bottom are parallel. The problem is that, to machine any features into any side of this box requires three mutually perpendicular datum planes. The primary datum plane is obviously established
Tunalover