I had an above ground pool set up and the excavators dug out about 3 feet of earth about 3.5 feet from the corner of my garage. I am concerned it was dug too close to the slab of the garage which is part of the house. I will be backfilling to the pool but wanted to get opinions on whether there may be slab issues in the future. Any structural, civil eng, or anyone with thoughts would be appreciated. I uploaded a pic which hopefully is viewable.