haynewp
Structural
- Dec 13, 2000
- 2,329
If rebar is developed on either side of the shear plane, one side being with epoxy that develops the rebar with the epoxy but not long enough to develop the rebar if it was in bond with concrete only, should you be able to use shear friction by ACI or be forced to the concrete breakout checks in Appendix D?