qilin
Civil/Environmental
- Oct 5, 2005
- 1
In Paydirt, how do I enter the borehole data
Say:
Depth
Topsoil 0 - 1'
Sand 2-4
Rock From 4'
I couldn't get a proper report if I input the data as relative depth from the existing elevation.
Should I use 4' for my rock?
Thanks
Say:
Depth
Topsoil 0 - 1'
Sand 2-4
Rock From 4'
I couldn't get a proper report if I input the data as relative depth from the existing elevation.
Should I use 4' for my rock?
Thanks