IRstuff
Aerospace
- Jun 3, 2002
- 44,758
It's not at all clear from the record that the Kansas City engineers were even concerned about cost. They were simply negligent. The contractor's change was motivated by cost, because, without the changes they made they would have had to thread something like 40 ft of stock, which would have taken both time and manpower. Even if the contractor hadn't made the change, the basic design was insufficiently margined.
TTFN