Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Engineering Cost/ Task Codes

Status
Not open for further replies.

KSTOK

Structural
Joined
Oct 26, 2006
Messages
5
Location
US
Need help creating a list of cost or task codes.

Production codes to breakdown a building design.
 
engineering design
drafting
site visit
project management
CAD management
research
construction services
engineering changes
CAD changes


 
How detailed do you want to be? For example, in drafting, you could have sub-codes for preliminary drawings, final drawings, revisions, etc.
We have codes for meetings, prepping for meetings, phone calls, email, etc. Allows us to show a client where the charges come from on a T&M job. On a lump sum it's not so imporatnat.
 
Yeah, it is really all about the contract with the client too. Sometime a contract will have a flat fee for one code, and hourly on the other (i.e. site visit).
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top