Engineering-Contractor report (P3A)

Status
Not open for further replies.

GemmellG

Materials
Joined
Jun 28, 2012
Messages
89
Location
CA
Assembled five OTSG Boilers (ASME Sec1) in Northern Canada Boilers are complete & hydro tested. Authorized Inspector (A.I.) has pointed out an issue with the Engineering-Contractor report (P3A). Original Engineering contractor (Brand X) was bought out by (Brand Y) and is no longer in business. Please Note: buy out was after my company started field assembly. Line 1, on the P3A Engineering-Contractor has (Brand X) Name & Address; line 8 Certificate of Compliance has (Brand Y). A.I. states this is not acceptable & (Brand Y) should contact National Board for clarification. Has anyone came across this in the past.
 
So why can't Brand Y fill out a new P-3A data report and submit to the National Board? If Brand Y purchased Brand X they are now the same company and should be able to submit a revised data report.
 