boottmills
Mechanical
I am looking to reduce the number of Engineering Change Orders that we currently do. The way it works right now is that if there is any change to the print, then we need to ECO the print, even if it does not have anything to do with the form, fit, or function of the part.
What I am trying to propose is that if the change does not modify the form, fit, or function of the part then it should not be a ECO, but a Document Change. The document change will not change the revision of the drawing, but will change the version of the revision.
Is there anyone who is doing anything like this already, or has any ideas for doing this?
Boottmills
What I am trying to propose is that if the change does not modify the form, fit, or function of the part then it should not be a ECO, but a Document Change. The document change will not change the revision of the drawing, but will change the version of the revision.
Is there anyone who is doing anything like this already, or has any ideas for doing this?
Boottmills