We will be energizing a 13.2/480v, 500 kva, delta/Y transformer for the first time. It has been stored inside of the switchgear room.
It has been torqued, cleaned and and hipotted.
I have heard of connecting 110v lamps to the windings to make sure the windings don't have any trapped moisture.
Is this necessary? If it is how is the best way to do this?
Thanks for any help