I m desingning a roadway that goes through a flat and inundation susceptible (in both sides of the road) so drainage will only be used to keep the same water level in both sides.
How or what is the method to obtain the level that is required for my embankment. (hydric balance or something like that?
How or what is the method to obtain the level that is required for my embankment. (hydric balance or something like that?