@Steel PE - "The AISI has a very specific set of requirements for using the reduction factors to determine the LTB capacity of the gifts. One of the big requirements is attachment of the panel to the girt every 12 inches o.c. The other is the rib spacing on the panels. IMP system have attachments ever 30” o.c. And the backside of the panel is not corrugated. So it’s a no go in accordance with the AISI."
Question - Would the inherent stiffness of the IMP (Face - insulation - face) be rigid enough to satisfy the thickness gauge and rib depth and spacing prescribed in the AISI.
Considering the Client is willing swap the cost of sag rods for the extra labour and material for 12" OC for the IMP attachment.
Question - Would the inherent stiffness of the IMP (Face - insulation - face) be rigid enough to satisfy the thickness gauge and rib depth and spacing prescribed in the AISI.
Considering the Client is willing swap the cost of sag rods for the extra labour and material for 12" OC for the IMP attachment.