New elevators because they use microprocessor controls have both temperature and humidity requirements. Thus we use air cooled ceiling hung computer room type AC units (with humidification & reheat o/& humidified ventilation air from a main AHU) that would run all the time. Get requirements from elevator manufacturer. Also get requirement on elevator shaft smoke venting.