I am working on a Highways Project which inculding Embankment. As the ground contain thick clay and the embankment are high, part of embankment are decided to constructed with piled foundation. And this raise the question......
For those embankment with no piled foundation, the embankment load will tranfer to soil and thus create the lateral load to the piled foundation next to it. However, I have no idea how to calculate for the effect of those lateral to the piles.
Here is some information of the foundation
The piled foundation is in 2m spacing with 0.35m square driven pile. Clay layers from various 15m to 25m.
I hope if anyone of you have such experience could give me some advices or give me some refrence to read.
Thanks!!!!!!!!
I am working on a Highways Project which inculding Embankment. As the ground contain thick clay and the embankment are high, part of embankment are decided to constructed with piled foundation. And this raise the question......
For those embankment with no piled foundation, the embankment load will tranfer to soil and thus create the lateral load to the piled foundation next to it. However, I have no idea how to calculate for the effect of those lateral to the piles.
Here is some information of the foundation
The piled foundation is in 2m spacing with 0.35m square driven pile. Clay layers from various 15m to 25m.
I hope if anyone of you have such experience could give me some advices or give me some refrence to read.
Thanks!!!!!!!!