Redpipe
Mechanical
- Sep 17, 2002
- 17
My company specification require TE/TT designed for EExd.
Now we are replacing existing thermowells with new type. But we found the problem about connection. We cannot connect new thermowell to existing element due to no full thread of cover flange. Therefore we decide to install nipple and full coupling to cover flange, then connect existing element.
Since our specification required EExd for TT/TE, I don't sure that nipple and coupling must be EExd design or not.
Can anyone make me clear for EExd requirement of TT/TE?
Thank you very much,
Bob
Now we are replacing existing thermowells with new type. But we found the problem about connection. We cannot connect new thermowell to existing element due to no full thread of cover flange. Therefore we decide to install nipple and full coupling to cover flange, then connect existing element.
Since our specification required EExd for TT/TE, I don't sure that nipple and coupling must be EExd design or not.
Can anyone make me clear for EExd requirement of TT/TE?
Thank you very much,
Bob