Is it permissible/common to interpolate the CD duration of load factors?
Application is vertical and horizontal lumber (soldiers/walers) for 5' high concrete wall forms, with the 1-minute factor of 1.6 vs 7 day factor of 1.25.
Can I use 1.4 or 1.5 given load duration is less than 24 hours (wet plastic concrete form pressures)?