QSE
Structural
- Dec 17, 2002
- 15
Hi geotech experts
I need to estimate uplift capacities of existing steel driven pipe piles in dense till. Piles are 16" in diameter, pre-bored and driven to refusal.
SPT for till is 50+ and water is at the surface. Pile reached refusal at about 30 ft and were driven with opened ends.
Thanks
QSE
I need to estimate uplift capacities of existing steel driven pipe piles in dense till. Piles are 16" in diameter, pre-bored and driven to refusal.
SPT for till is 50+ and water is at the surface. Pile reached refusal at about 30 ft and were driven with opened ends.
Thanks
QSE