soils212
Geotechnical
- Nov 16, 2007
- 11
Looking for general rule on refusal with driven H piles into bedrock (Shale). This is a road bridge project. The site has 30 to 40 feet of soft clays over shale which has 50 blows for 4 inches about 3 to 5 feet into the shale. Have seen 10 to 15 blows for an inch for refusal. Is a minimum embedment into bedrock typically given or is it totally controlled by refusal? We are looking at 10 feet. When are reinforced tips usually recommended?