I was wondering what others do regarding the embedment length of a single drilled shaft, e.g. one that is supporting a noise wall or traffic pole. This is something I've never thought about because the situation came up.
For a single shaft is it customary to increase the embedment length for example 3 to 5 feet as a precautionary measure, in the event that someone migth excavate in close proximity to the shaft to install, for example, a utility line?
I asked one of the geotechs here and he says there's no reason to add extra length.
For a single shaft is it customary to increase the embedment length for example 3 to 5 feet as a precautionary measure, in the event that someone migth excavate in close proximity to the shaft to install, for example, a utility line?
I asked one of the geotechs here and he says there's no reason to add extra length.