Is it practical to ask contractor to clean up dried concrete from previous pours, The contractor I am working with thinks this is not practical that he has to clean up old concrete from rebar. I tried to explain to him that the old concrete if not cleaned will reduce bonding. I like to hear you thoughts on this?
