Hi Folks:
Whats the best way to transfer the shear, when shear wall running parallel to wall?
1. extending wall ( build pony wall) all way up to floor/roof?
2. provide floor truss on top of wall?
3. Rim joist on top of wall?
If we use truss, sheathing is not necessary to bring all way up to floor, I guess. Then we need to provide drag load to the truss manufacturer. Sometimes that load could be huge for high wind area.
I am curious which way is the most common practice or cheaper construction.
Please advise.
Thanks in advance
km
Whats the best way to transfer the shear, when shear wall running parallel to wall?
1. extending wall ( build pony wall) all way up to floor/roof?
2. provide floor truss on top of wall?
3. Rim joist on top of wall?
If we use truss, sheathing is not necessary to bring all way up to floor, I guess. Then we need to provide drag load to the truss manufacturer. Sometimes that load could be huge for high wind area.
I am curious which way is the most common practice or cheaper construction.
Please advise.
Thanks in advance
km