tapetotape
Automotive
- Dec 11, 2002
- 8
operating load = maximum instant demand = 200 mbtu/h, flow = 10,00 gpm, delta p = 45 psig (pipe size 20"
This is how the requirement appears for required supplied hot water to building and process ASH. Any easy way to convert this to psi? What is PSIG anyway? Temp in is (F) 200, out 160.
This is how the requirement appears for required supplied hot water to building and process ASH. Any easy way to convert this to psi? What is PSIG anyway? Temp in is (F) 200, out 160.