KimWT
Structural
- Jul 15, 2003
- 71
Hi!
I missed one #7 bar of 2-#7 A_sh (shear reinforcement for the diagonal tension crack of the reentrant corner) of precast DT which will support fire truck load.
How can I repair this DT bearing connection?
Here are member dimensions:
7ft wide DT with 20" high stem including 2" flange (61ft long).
7" deep 12" high blockout.
Thanks!
I missed one #7 bar of 2-#7 A_sh (shear reinforcement for the diagonal tension crack of the reentrant corner) of precast DT which will support fire truck load.
How can I repair this DT bearing connection?
Here are member dimensions:
7ft wide DT with 20" high stem including 2" flange (61ft long).
7" deep 12" high blockout.
Thanks!