Bill3752
Chemical
- Jan 24, 2008
- 138
I have a double pipe exchanger. Per API 521 (5.19.6), if both are schedule pipe, then it is acceptable to base the relief scenario on something other than a tube failure. However, it does make sense to look at possible weld failures. My question is "what is a reasonable failure size to use for such a case?" Presumably, the rupture disk will fail with even the slightest weld failure - well before it enlarges. Is there a good rule of thumb to use?