Jul 16, 2002 #1 Iecfan Industrial Joined Mar 12, 2002 Messages 2 Location US Our traing that we are currently taking is with project 2000. Our instructor tells us that we can not integrate it with outlook for such things as the calender. Does the new 2002 version have that available? Thanks
Our traing that we are currently taking is with project 2000. Our instructor tells us that we can not integrate it with outlook for such things as the calender. Does the new 2002 version have that available? Thanks