Referring to my rough freehand sketch schematic. I have a prestressed deck unit bridge with a composite in-situ concrete deck bridge structure which has a slight cantilever overhang (2' / 600mm). I need to provide drains through the kerb units and as a result, some of the longitudinal reinforcement in the kerb needs to be displaced to avoid any clashing with the drains. This bar serves as a longitudinal bar for the torsional reinforcement for any traffic barrier loads which are imposed on the kerb.
What is the best solution / what are my options for this problem?
Referring to my rough freehand sketch schematic. I have a prestressed deck unit bridge with a composite in-situ concrete deck bridge structure which has a slight cantilever overhang (2' / 600mm). I need to provide drains through the kerb units and as a result, some of the longitudinal reinforcement in the kerb needs to be displaced to avoid any clashing with the drains. This bar serves as a longitudinal bar for the torsional reinforcement for any traffic barrier loads which are imposed on the kerb.
What is the best solution / what are my options for this problem?