54Civil
Geotechnical
- Nov 12, 2010
- 1
We are constructing a 8m high fill for a bridge approach. Under a portion of the fill there is a mined out gravel pit approx 2-3 m deep. Some organics have accumulated in the bottom. We are only filling a portion of the old pit. Does any one have a spec for placing granular fill to maximize the displacement of the organics without excavating them?