phamENG - not sure about the netting, horizontal loads could be quite big if a truss falls (they're seriously damaged, with strut buckling and LTB). The fixing of the net would mainly be done on masonry, would need extra structural element to route the loads to structural members. There's a lot of damage from the blast, even on concrete structural elements. What i'm looking for is to take the machines out before repairing (maybe partially demolishing) the construction.
Maybe MIStructE_IRE proposal of a crash deck / working platform just under the roof is simpler after all.
retired13 - can't put 2 cranes, i only have crane access from one side, and there's a significant distance to the truss members, huge crane i guess, $$$